PAZ Super Sites
Former Columbian Carbon Site (Proctor, Marshall County, WV)
11111 Energy Highway
Proctor, WV 26055
Proctor, WV 26055
CIty Limits: No
County: Marshall
Latitude: 39.8002
Longitude: -80.821
Industrial Park: No
Zoning: None
Covenants: None
Industry Concentration Designation: WV Polymer Alliance Zone
Land Size
Total Acres: 402
Developable Acres: 38
Will owner subdivide property: No
Property for lease/sale: Sale
Building Size:
30,000-SF building (plus additional outbuildings) w/30 parking spaces available
12,650 SF laboratory
15,500 SF maintenance shop
Transportation
Interstate/4-Lane Highway: 22 MILES south of I-470 & 24 MILES south of I-70
Commercial Airport: 72 MILES from Pittsburgh International Airport
Rail: Yes
Served by: CSX
Spur: Yes (2,500 FT rail siding)
Navigable River: Yes
Access: Yes (MILE 115.5)
Mooring Cells: Yes (3)
Utilities
Electricity: Yes
Electric Utility Name: AEP
Proximity to Power Line: 1,000 FT
Transmission Voltage: 69kV
Distribution Voltage: 12kV
Phase: 3 (300 FT)
Distance to substation: 890 FT
Available Capacity (MW): 3
Gas: Yes
Gas Utility Name: Hope Gas
Size of Gas Main: 3 IN (plastic)
Proximity to Gas Main: 1.69 MILES
Gas Pressure: 50 MAOP (Medium Pressure)
Size of Second Gas Main: 2 IN (steel)
Proximity to Second Gas Main: 2.90 MILES
Gas Pressure (Second Main): 33 MAOP (Medium Pressure)
Water: Yes
Water Utility Name: Marshall County PSD #2
Proximity to Water Main: N/A
Size of Water Main: N/A
Water Pressure (static): N/A
Water Pressure (residual): N/A
Excess Capacity of Treatment Plant: N/A
Sewer: Yes
Sewer Utility Name: Marshall County PSD #2
Proximity to Sewer Main: N/A
Size of Sewer Main: N/A
Excess Capacity of Sewer Treatment Plant: N/A
Telecom: Yes
Telecom Utility Name: (Xfinity, Frontier, T-Mobile, Earthlink, ATT Verizon, Viasat & Starlink)
Broadband: Xfinity, Frontier, ATT & Verizon
- Broadband (Fiber): Yes (Frontier Fiber & EarthLink Fiber)
- Broadband (Cable): Yes (Xfinity)
- Broadband (DSL): Yes (Frontier)
Quick Facts
- Former Carbon Black Production Site
- Private water wells onsite
- Site in the heart of the Marcellus and Utica Shale Basins
- Full frontage and access to WV 2 (Energy Highway)
- Multimodal capabilities
- Power ready and proximate to power plant and substation
- Justice 40 Disadvantaged Community
- Coal Closure Energy Community
Contact Information
Pat Ford, Vice President, PAZ
304-428-1622
PAT.FORD@PAZWV.ORG
Loading...
No Records Found
Sorry, no records were found. Please adjust your search criteria and try again.
Maps failed to load
Sorry, unable to load the Maps API.